Logistics on the Mainframe: Runtime Down 85 Percent in Ten Days

Three business-critical logistics and billing systems, optimised at the level of algorithms and data access – with savings between 60 and 85 percent.

01Success story
Client
German car manufacturer
Industry
Automotive & Manufacturing
Solution
Delivery date and route calculation, logistics, billing of advance payments
Period
2008–2009
Our role
Analysis, optimisation and re-engineering
Technologies
z/OS, PL/I, DB2, IMS
−85 %
runtime of a batch job, within ten days
−75 %
maintenance and project costs of a logistics system
−66 %
operating costs of a billing system
−60 %
CPU consumption
02Starting Point

Starting Point

A batch job that calculates delivery dates and routes no longer finished within its time window, and the project depending on it had come to a halt. Two further systems – one in logistics, one for billing advance payments – caused high costs in operation and maintenance.

03What We Did

What We Did

For the batch job the aim was a runtime 30 percent shorter. After ten days it ran within its window again – 85 percent faster.

The logistics system was re-engineered within six months, with two months of parallel run. In the billing system, caching and event-based recalculation replaced repeated calculations – within 30 days.

Results

  1. 01

    85 percent shorter runtime

    The target had been 30 percent; the job has run within its time window ever since.

  2. 02

    75 percent lower maintenance costs

    In the re-engineered logistics system, with 60 percent less CPU consumption and 90 percent fewer program branches.

  3. 03

    66 percent lower operating costs

    In the billing system for advance payments.

With the measures you proposed, the runtime could then be reduced once more from 23 minutes to 3 minutes. […] For me, that made the whole undertaking a complete success.

IT manager at the client, 2009 · translated from German

World-class computer science for tomorrow's digital business